Blog Layout

Groundworks in action

Michael Hand • 18 October 2022

Location: Stroud Park, Banbury.


The client: InstaVolt.


Charging stations: Increased from 8 to 16.


The proposal:

Increase the number of existing charge points along a major motorway route, to ensure that adequate charging infrastructure is available in the UK to keep up with the increase in EV uptake and to improve accessibility of charging points in line with PAS 1899:2022 a new specification on accessible public charge points for electric powered vehicles.


The build: Watch the project groundworks and infrastructure progress throughout the 8 week extension.


by Michael Hand 31 March 2023
If you’re planning on hitting the road in your EV, read our top tips and hacks, to save money, time and stress for a successful journey.
by Michael Hand 1 March 2023
The ChargePoint® 6000 Series (CP6000) makes you part of the future of electric mobility, now. What are the main benefits of the CP6000? Let’s have a look...